Showing posts with label Yamaha Excel III. Show all posts
Showing posts with label Yamaha Excel III. Show all posts

Monday, December 13, 2010

I am back to projects:)

I am done with my garage work for now, so I can start working on the projects again. Last week I started making the shop press. It's going to be double column 12 ton press with hydraulic jack. Frame is welded together, now I need to make a base for it and the ram. After that's done I can deal with suspension parts and engines for the sleds:) Pictures are coming.
Read more...

Wednesday, October 6, 2010

Yamaha is air TIGHT!!!


Couple things happened: I brought the boat to my place in city and I pressure tested the Yamaha sled engine - it passed!!!

The pressure test surprised me with good result! I was prepared for the worst scenario and brought tools to remove the engine from the sled. I blocked the exhaust with rubber sheet


and plugged the inlet with tester adapter,

pressurized to 8 psi: lost the pressure in a minute!!! Sprayed the engine with soapy water - no bubbles, but I could hear the air escaping somewhere... It was a pulse line for fuel pump! Blocked that and pressurized engine again to 8 psi.

Waited a couple minutes - still 8... Left it for 10 minutes - 8 psi... Great! Put everything back together - will test-drive the sled when we get the snow.
Now I think, that I could make the test a bit more complicated by cranking the engine a couple times before it, but I think it wouldn't make a big difference: if I will have a leak at seals, I would find that anyway...




Read more...

Wednesday, April 21, 2010

Apr. 20/21 - worked on the boat and the snowmobile

Decided to use two days of good weather and did some work at the cottage on Lake Simcoe.
Drained gas from the sled: got 20L... Good for a weekend of fishing! I had a plan to install back repaired suspension, but I found, that the rails were not straight. They wobbled at the straight surface. Here are some pictures:

Good side, nice and straight:





Here is the other one. You can clearly see the bend in the center of the rail:






I had to change plans: need to fix that problem. Time to disassemble suspension again.
Another thing to do on the sled is the secondary clutch sliders. I missed the moment when they worn out, so now I need to install new ones and fix the damage on the moving parts. Some blending will help...
Here is the problem:

I can fix those things at home, so I covered sled until next time...

By the noon I decided to start playing around my boat. Removed the cover... Checked inside: dry and clean as I left it! Good news!
Last year I finished work on the stringers and bulkheads. Well, mostly... Still needed to do some cuts and adjustments. Not a problem! Cutting is always fun! That funny job kept me busy till the evening.
Next day began at 7AM. Went to nearest dock and fished for perch. Beautiful morning! Not too many fish though...


Returned from fishing by 10. Continued work on bulkheads... Assembled everything to check. Here are some pictures:









And here is the picture of myself with the boat:)


Next time plywood will be laminated with a fiberglass and installed in the hull. Need at least 3 days of good weather to do it. Maybe next week...




Read more...