Sunday, September 19, 2010
More work done on frame
It was busy weekend: I managed to make a lot! I didn’t spend too much time, though…
Yesterday I fabricated the small piece for the left stringer and welded it in. It’s amazing: it takes just a few second to write about it:)
Here are some more pictures of the stringer piece:
Today I was looking at the belly pan and certainly didn’t like it. Corroded way too much! So, grinder in hands – cut it out! I decided to try fabricating the new belly using the remaining as a guide.
Professional sheet metal work always hypnotizes me, but I never had much luck with it. Takes a lot of effort to learn…
Anyway, with my rubber mallets and a piece of dense foam I managed to shape the new belly pan kind of close to original…
It’s not perfect by any means, but rest of the frame is pretty beat up, so it doesn’t look odd… It took a few minutes to cut it in size and tack weld it to the frame. After that I checked the fuel tank fitment, it went in easily.
After that I welded new piece around. Looks not too bad.
One more small piece to weld in and the front end is done!!!
2 comments:
This entire process is taking a bit of time but its sure going to be worth it in the end Max!! Your doing a great job!!
Nick
Thanks Nick!
Post a Comment