Monday, June 28, 2010
Some more work done on the boat
On last Thursday weather was nice and I decided to use this chance to do some more work on the boat. I leveled the bulkheads and stringers, trimmed all the glass and glued in supports for the floor. Next step is drilling the drain holes and installing the drain PVC pipes. After that I can fix top the hull and the top half of the boat and put it back together. Floor could be done in between those operations: final installation of the floor will be done after installation of the top half of the boat. All I need now is some good weather and next 5 galons of resin:)
Labels:
Boat
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment